Make Your Site Eco-Friendly with 100% Renewable Solar Energy.
The use of 100% clean and renewable energy sources for a sustainable future is becoming more important day by day. Many regulations and regulations have been implemented in order to encourage electricity production from solar energy. In this context, at least a certain amount of renewable energy requirement has been imposed on sites and buildings with intense electricity consumption. By generating their own electricity, the sites are encouraged to both provide cost advantages and be built in an environmentally friendly manner.
SPP and Advantages Specific to Sites and Buildings
- Solar Power Plants that you will install on the roof or unused areas of your site will only have an initial institution cost. Although these installation costs may seem a bit high at first, the project pays for itself in just a few years.
- Solar Power Plants, which are the lowest cost electricity generation method, allow you to generate electricity from the sun without the need for any fuel. In our country, which has a high solar potential, you can make maximum use of solar energy for your site, and in this way, you can meet all your electricity needs in common areas from nature.
- If you produce more electricity than you use, the electricity you do not use can be transferred to the grid and recorded as electricity receivable on your site so that you can use it on less sunny days.
- The average life of Solar Power Plants is 25 years. After your project covers the installation costs in the first few years, you will continue to generate your electricity from nature free of charge for many years. Moreover, as a site using 100% renewable clean energy, you will continue to be a part of an important social responsibility project.
How Does the GES Installation Process Work?
In order to be able to install the SPP on your site, it is essential to carry out the necessary exploration and feasibility studies. If the site is still at the project stage, it is important to prepare the project in such a way that maximum GES installation can be done. As a result of feasibility studies, the amount of electricity that can be produced annually, the total cost of the project and the recycling period are calculated. After you approve the project, you will receive the necessary permits for your electricity generation and your project will be implemented on a turnkey basis.